Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 49 results ...

Abdelkhalek, S I (2022) Managing the inspection process of concrete bridge decks, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Aoieong, R T (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM), Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Au, C Y M (2013) An optimal contract strategy in managing extension of time provisions in building contracts, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Bao, Q (2003) Effective energy management during a building's life cycle, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, K C G (2012) The use of virtual reality for visualizing construction safety management process, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, W T P (2009) Construction industry development and government policy, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, Y M T (2008) The role of finance in competitiveness of indigenous contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chen, Z (2003) An integrated analytical approach to environmental management in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Fu, W K (2004) The effect of experience in construction contract bidding, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Huang, T (2009) Virtual prototyping technologies enhanced construction planning, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

  • Type: Thesis
  • Keywords: built environment; private sector; building industry; formwork; in-situ; timber; design cost; fabrication; prefabrication; sustainable building; sustainable construction; Hong Kong; case studies; interview; questionnaire survey
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305157542
  • Abstract:
    The construction industry in Hong Kong heavily relies on conventional cast in-situ construction involving extensive use of timber formworks and wet trades. In 2001, the Construction Industry Review Committee report described the construction activities in Hong Kong as ‘labour intensive, dangerous and polluting’. Globally, however, the recent trend is prefabrication, which is being increasingly used in the building industry, alleviating some of the environmental burdens associated with conventional construction. Very few studies have assessed the sustainable construction aspects of prefabrication in dense urban environments in terms of economic, environmental and social benefits and limitations of using prefabrication. Prefabricated building components have been adopted in Hong Kong for over two decades for high-rise buildings from the public sector. There is a need to study the use of prefabrication in high-rise buildings, especially for projects in the private sector given the global trend towards sustainable construction. This research project aims to investigate the evolution and application of precast construction in high-rise buildings and assess the sustainable construction aspects of prefabrication in dense high-rise urban environments like Hong Kong. In this research, five major ways of collecting and analysing data are pursued, using a combination of quantitative and qualitative methodologies: questionnaire surveys, compilation of a database, detailed case studies of recently completed buildings in Hong Kong, face-to-face interviews, and site observations. The study reveals that a wider application of prefabrication in buildings in Hong Kong could significantly contribute to economical, environmental and social benefits, especially in dense urban environments. In the detailed case studies, on an average, a reduction of 65% of construction waste, 16% of labour requirement on-site and 15% of construction time is noted when adopting prefabrication techniques. The findings also reveal that prefabrication combined with modular design and standard precast elements saves time and construction/design costs, as the prefabricated building system is not reinvented for each project. The study suggests that a critical agenda should include the development of serious aspiration towards a more environmentally responsible and sustainable building industry (e.g.closed-loop material principles) to achieve a healthy built environment and efficient use of resources.

Kam, C W (2000) Quality assurance of construction works in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lee, L P (2012) Do construction workers accept automated monitoring? A study on the acceptance level and its antecedents, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liang, Y (2006) Integrated IT systems for construction site management, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lin, G (2009) Measuring the performance of value management studies in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, G W (2003) A framework for implementing value management in China's construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tan, Y (2009) Contractor's competitiveness and competitive strategy in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities, Unpublished PhD Thesis, Department of Civil and Structural Engineering, Hong Kong Polytechnic University.

Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, J (2010) A framework for stakeholder management in construction projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ye, K (2009) Modelling competition intensity in construction market, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yuan, H (2011) A dynamic model for assessing the effectiveness of construction and demolition waste management, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Zhang, X (2010) Competitiveness for real estate developers: a China study, Unpublished PhD Thesis, Department of Building and Real Estate, Hong Kong Polytechnic University.